Reservoir Lining Systems
Aquadam UK Ltd believe that all reservoir lining systems should be installed in complience of full CQA (certified quality assurance). Everyday before lining work commences, on-site test welds should be carried out and tested on-site with the use of a tensiomter (lab testing kit). Roll numbers, panal layout, seam weld air pressure tests should all be recorded by the lining contractor/site supervisor in their daily log records.
To meet irrigation demand, large storage reservoirs lined by Aquadam UK Ltd are recognised as the key to water self-sufficiency.
Applications that bebefit from our liner:
- Irrigation Reservoirs
- Run-off Reservoirs
- Storm Ponds
Reservoir lining systems installed by Aquadam UK Ltd have a minimum 25 year perfomance warranty.


